AC18.1 – Assigned Person Resource Rates

System
Activity Management (AC)
Type
Online screen — form 18
Updates
2 tables
References
4 tables

AC18.1 (Assigned Person Resource Rates) is a Lawson Activity Management online screen (form 18, subform 1). It updates ACACRESRT and ACACRESRTX and references ACACTGRP, ACACTIVITY, ACRESOURCE and ACUOM.

About AC18.1

Use Assigned Person Resource Rates (AC18.1) to define rates for Assigned Person resources. You can define resource rates by activity or activity group to use different rates in transactions depending on the resource and activity involved. Resource rates by activity override any standard resource rate you may have defined. Resource cost rates are used in Resource Journal Entry(AC41), Subcontractor Time And Material Entry (AC42), Transaction Interface Adjustment (AC54.1), and Transaction Interface (AC540) to determine transaction amounts. Resource billing rates are used for Time and Materials billing. **Process at a Glance 1. Access the appropriate form for the type of resource for which you want todefine rates by resource and activity. (Use Assigned Person Resource Rates (AC18.1) to define rates by AC person.) 2. Select the Activity Group or Activity for which you want to define rates. 3. Select the resource you want. 4. In the Currency Code field, type or select the rate's currency. 5. Define rates for the resource.

Updated files (2)

TableDescriptionSystem
ACACRESRTResource Standard CostAC
ACACRESRTXAC Resource Standard Cost DtlAC

Referenced files (4)

TableDescriptionSystem
ACACTGRPActivity GroupAC
ACACTIVITYActivityAC
ACRESOURCEActivity ResourceAC
ACUOMActivity Unit of MeasureAC

Program calls

Invoked programs (11)

ACAC, ACTA, API4, IFAC, IFCU, IFLU, IFOB, IFSG, IFUP, SLSE, SLSU